The Enterprise Pilot
6–8 weeks · Measured rollout with training, playbook, and metrics that prove ROI
Outcomes
- Baseline metrics and a clear definition of success before rollout.
- Custom adoption playbook and weekly coaching so adoption sticks.
- Executive dashboard with throughput, stability, and quality metrics that survive scrutiny.
Timeline
- Weeks 1–2: Kickoff: baseline measurement, scope, and success criteria.
- Weeks 2–4: Training (Talk + Bootcamp or tailored); adoption playbook draft.
- Weeks 4–6: Rollout support; weekly coaching; metrics collection.
- Weeks 6–8: Dashboard finalization; readout and recommendations.
Deliverables
- Baseline and post-pilot metrics (e.g. lead time, review turnaround, defect rate).
- Custom adoption playbook: who does what, escalation, and quality gates.
- Executive metrics dashboard and a short readout document for leadership.
FAQ
We use objective metrics (e.g. DORA-style throughput and stability) and baseline vs post-pilot comparison. We avoid invented numbers; we document sources and methods so results are auditable.
We adapt to your tools and repos. The pilot framework (baseline, playbook, dashboard) is stack-agnostic; labs and checklists are tailored to your environment.
Yes. Pilots often start with one product team or one use case. We design the playbook and metrics so you can replicate the approach when you scale.
Ready to run an Enterprise Pilot?
Book a call or email us. We'll scope timeline, team, and success metrics.